我想学耍QQ7钻,18p2p哪位大神知道免费教我,日后必定报答

急,求以下英语翻译,万分感激各位,重酬!小弟日后必定报答各位的恩情,谢谢!_百度知道
急,求以下英语翻译,万分感激各位,重酬!小弟日后必定报答各位的恩情,谢谢!
急,求以下英语翻译,万分感激各位!
17胶门体门钩挂弹簧处断裂处理方案
不合格原因:胶门体扣位结构偏弱存在质量隐患
针对不良品采取以下维修处理方案如下:
100%拆产品包装取出成品机 (注意拆机时保护好彩盒)
In spring, such as (figure 1, figure 2)17 rubber door the door hook in spring scheme fractureUnqualified causes:First step:100% open out product packaging product machine (note down unit protect color box)Second, cannot have broken (plastic frame for PBT material brittle)Third,3 attention must be removed plastic doors:Fold plastic frame1 under the door from glue with 128mm 40mm edge, a word with small screwdriver inclined to insert glue, glue doorcase door light force will glue doorcase cock,2 from plastic door left edge with 170mm 75mm about, like (figure 3, figure 4) with a small screwdriver inclined steel insert and glue doorcase, light force will glue doorcase cock: rubber door clasp structure weak exist hidden qualityIn bad product adopt the following maintenance treatment scheme is as follows
采纳率:11%
5) with high quality steel oblique mouth in spring,4 like (figure 6)2 with little pointed nose pliers, the rubber door the foreign body such as (figure 7)3, and will cut good door hang hooks spring side door (figure 8) on the hook, the surface is not, and the other hand glue with little pointed nose pliers took spring will be another end hanging in metal body below the first teeth as (FIG 9)17 rubber door the door hook in spring scheme fractureUnqualified causes, then hang hooks in spring steel body incisors up:First step:100% open out product packaging product machine (note down unit protect color box)Second, the ending in a short cut except about 1&#47, rubber door hook posts1, remove spring, switch of inspection door door if spring assembly hook OK (figure 1)Fourth step: clean body1, our quality assurance department has also made full validation is the following:1, 5) also expressly respectively with the solutions to the laboratory test of sliding door, According to the normal usage.Note: in the repair process should be carefully put products, to prevent damage componentsSecond, 17 rubber door the door hook in fracture repair plan spring validation reportMaintenance plan validation:A, according to customer feedback and rubber door door series products of fracture in spring hook quality problem, We also make a set of this quality problem maintenance scheme, buckle fracture phenomena.2, the plan implementation after testing machine is a microwave oven leakage phenomenon,3 and 5) according to 500, 10, 15 and 20 times of sliding door, through the test data of test results is obtained. (see rubber door door hook in fracture repair plan spring validation test report)4, therefore, we did this scheme by the relevant tests to verify, At the conclusion of the test of the scheme is efficient and follow-up customer feedback and platform microwave door off and buckles a hook the quality problem of the fracture, This scheme to resolve maintenance. Third, microwave oven and platform door hook in spring quality problem structure fracture rectification report1, the main reason is: rubber door analysis of reinforcement design buckle a spring short and buckles strength of weak structure hidden quality (see chart 1 and 2).2 and corrective actions:Change a lengthened glue spring steel door, buckle size of 17 series platform structure is consistent, The development of the original 17 platform position on the basis of 1MM and increase sack bits edge. Now feeding up buckle a thick 2.5 MM has reached to increase the strength to buckle a standard (figure 3),. The product is left open a door of rubber door mouth, the clean,2, the machine must be clean, a hard plastic door handle gently, hand up the doors will glue in rubber door5, such as door hook (FIG,3 attention must be removed plastic doors, pull hook up and down movement:Fold plastic frame1 under the door from glue with 128mm 40mm edge, cannot have broken (plastic frame for PBT material brittle),4, such as (FIG. 10) with a small screwdriver into rubber door and glue inclined frame, glass plate, specifications according to the original place,2, then the pack, the door open or closed door systems to verify in continuous working switch test cycle condition is out with a hook spring:In spring. (see annex) the maintenance planSecond, a word with small screwdriver inclined to insert glue, glue doorcase door light force will glue doorcase cock,2 from plastic door left edge with 170mm 75mm about, like (figure 3, figure 4) with a small screwdriver inclined steel insert and glue doorcase, light force will glue doorcase cock, such as (figure 1, figure 2).Part 5: the packaging products1, glue doorcase open door is unfavorable exceed altitude, cannot have broken (plastic frame for PBT material brittle)Third, hand against the posts: rubber door clasp structure weak exist hidden qualityIn bad product adopt the following maintenance treatment scheme is as follows
17 rubber door the door hook in spring scheme fractureUnqualified causes: rubber door clasp structure weak exist hidden qualityIn bad product adopt the following maintenance treatment scheme is as follows:First step:100% open out product packaging product machine (note down unit protect color box)Second:Fold plastic frame1 under the door from glue with 128mm 40mm edge, such as (figure 1, figure 2), a word with small screwdriver inclined to insert glue, glue doorcase door light force will glue doorcase cock,2 from plastic door left edge with 170mm 75mm about, like (figure 3, figure 4) with a small screwdriver inclined steel insert and glue doorcase, light force will glue doorcase cock,3 attention must be removed plastic doors, cannot have broken (plastic frame for PBT material brittle)Third:In spring, rubber door hook posts1, remove spring, such as door hook (FIG. 5) with high quality steel oblique mouth in spring, the ending in a short cut except about 1/4 like (figure 6)2 with little pointed nose pliers, the rubber door the foreign body such as (figure 7)3, and will cut good door hang hooks spring side door (figure 8) on the hook, hand against the posts, and the other hand glue with little pointed nose pliers took spring will be another end hanging in metal body below the first teeth as (FIG 9), glue doorcase open door is unfavorable exceed altitude, cannot have broken (plastic frame for PBT material brittle),4, such as (FIG. 10) with a small screwdriver into rubber door and glue inclined frame, a hard plastic door handle gently, hand up the doors will glue in rubber door5, pull hook up and down movement, switch of inspection door door if spring assembly hook OK (figure 1)Fourth step: clean body1, with a clean cloth, the clean,2, the machine must be clean, the surface is not.Part 5: the packaging products1, glass plate, specifications according to the original place,2, then the pack.Note: in the repair process should be carefully put products, to prevent damage componentsSecond, 17 rubber door the door hook in fracture repair plan spring validation reportMaintenance plan validation:A, according to customer feedback and rubber door door series products of fracture in spring hook quality problem, We also make a set of this quality problem maintenance scheme. The product is left open a door of rubber door mouth, then hang hooks in spring steel body incisors up. (see annex) the maintenance planSecond, our quality assurance department has also made full validation is the following:1, 5) also expressly respectively with the solutions to the laboratory test of sliding door, According to the normal usage, the door open or closed door systems to verify in continuous working switch test cycle condition is out with a hook spring, buckle fracture phenomena.2, the plan implementation after testing machine is a microwave oven leakage phenomenon,3 and 5) according to 500, 10, 15 and 20 times of sliding door, through the test data of test results is obtained. (see rubber door door hook in fracture repair plan spring validation test report)4, therefore, we did this scheme by the relevant tests to verify, At the conclusion of the test of the scheme is efficient and follow-up customer feedback and platform microwave door off and buckles a hook the quality problem of the fracture, This scheme to resolve maintenance. Third, microwave oven and platform door hook in spring quality problem structure fracture rectification report1, the main reason is: rubber door analysis of reinforcement design buckle a spring short and buckles strength of weak structure hidden quality (see chart 1 and 2).
17 plastic door hook door handle spring break program office Disqualification: plastic door buckle bit weak causes the quality of the structure Bad product for the following maintenance treatment programs are as follows: The first step: 100% split out finished product packaging machine (Note disassemble when protecting the color box) Part II: Plastic folding door 1 door away from the glue under the edge of 40mm and 128mm, such as in (Figure 1, Figure 2), the word screwdriver with a small ramp into rubber and plastic door frame, the light force to 2 rubber door from the left edge of about 75mm and 170mm, such as in (Figure 3, Figure 4), the word screwdriver with a small ramp into the iron gate between the body and plastic frames, plastic frames 3 Note that split plastic frames to be careful not to have broken (plastic frames for the PBT material more brittle) Part III: For the door hook spring loaded plastic door 1 Remove the door hook spring, such as (Figure 5) with high-quality steel clamp oblique mouth, ending in the spring Cut off except a small section of about 1 / 4, such as (Figure 6) 2, with a small needle-nosed pliers to remove the plastic door of the foreign body, such as (Figure 7) 3, will cut a good door hook spring hook on the door at one end (Figure 8), a hand stand up plastic frame, with the other hand spring with a small needle-nosed pliers to grab the other end of the first hanging in the iron beneath the If a tooth on (Figure 9), note that a high degree of not more than plastic frames opened the door hook, can not have broken (plastic frames for the PBT material more brittle), 4, such as (Figure 10) the word with a small screwdriver into the rubber door ramp door with glue, the one hand, Alice hard plastic door light, one hand pressed into the plastic door plastic door body 5, pull down movement of the door hook, door hook spring check whether the assembly OK (Figure 11) Step four: Clean the body 1, with a clean white cloth, 2, machine to clean the body surface can not have dirt. Part V: Packaging Products 1, the glass plate, according to original spe 2, then machine packaged good. Note: during maintenance products should be carefully placed to prevent damage to product parts 2, 17 plastic door hook door repairs broken springs Department program verification report Maintenance program verification: 1, 17 series of products for customer feedback plastic door hook door complete rupture of t quality of our company also have a set of maintenance treatment program. Defective items is to open the bottom left corner of a mouth plastic frames, then hung on the iron door hook body incisors spring up processing. (See in particular the maintenance program, see Annex) Second, the Department of Quality Assurance Division I also made this program fully verify the following points: 1, respectively, 5 sample units also use the machine's Fang Andao laboratory te by normal Shiyongqingkuang door to be opened or closed, Laiyanzhengmen systems have run continuously whether the switch Ceshizhouqi Tiaojian Xia spring hook and buckle bit out loss, fracture phenomenon. 2, after the execution of this program is a microwave leakage tes 3,5-Taiwan Machine by 500, and 2000 are the way to do sliding door second test, the data obtained by testing the end result is qualified. (See in particular plastic door hook door repairs broken springs Department program testing and certification report) 4, therefore, our company through this program to do the rele in the test also concluded that this program is effective, and 17 for follow-up customer feedback platform for microwave oven door have hook broken off and the button
all this maintenance treatment program to resolve. 3, microwave oven door hook 17 platform rupture from quality spring rectification report structure 1, the main reason analysis is: deductions bit plastic reinforced door spring is shorter and the size of the design strength of the structure buckle bit weak there is a certain hidden quality (see Figure 1 and 2 below). 2, corrective measures:
Change model plastic door extended spring buckle bit tendon size, because the plastic door 17 series platform s currently has 17 development platform based on the original button bit and button bit to increase 1MM from the tendon edge feeding . now button bit had reached 2.5MM thick material to increase the deduction to the strength of standard position (as shown in Figure 3);
这 个软件好好用啊,易 顺 佳提 供的刀模管理软件很不错。超 稳定,价格便宜,安全,功能齐全,好用。
其他2条回答
为您推荐:
其他类似问题
您可能关注的内容
英语翻译的相关知识
换一换
回答问题,赢新手礼包
个人、企业类
违法有害信息,请在下方选择后提交
色情、暴力
我们会通过消息、邮箱等方式尽快将举报结果通知您。我有心理问题,是个大学生,但是现在没钱,有人愿意帮助我吗?日后必定报答。_百度知道
我有心理问题,是个大学生,但是现在没钱,有人愿意帮助我吗?日后必定报答。
提示该问题下回答为网友贡献,仅供参考。
我有更好的答案
每间大学都有心理老师的,不需要钱的.如果你不知道,可以找辅导员或者学生会的同学问问,又或者在学校论坛上发帖,去学校的心理老师那里寻求帮助吧!祝你早日康复!
采纳率:31%
你的确有心理问题
其他1条回答
为您推荐:
其他类似问题
您可能关注的内容
心理问题的相关知识
换一换
回答问题,赢新手礼包
个人、企业类
违法有害信息,请在下方选择后提交
色情、暴力
我们会通过消息、邮箱等方式尽快将举报结果通知您。急用五万,有没有各位大神帮忙,可以在借货宝打借条,救命用,日后必定报答_百度知道
急用五万,有没有各位大神帮忙,可以在借货宝打借条,救命用,日后必定报答
我有更好的答案
我这可借你
真的可以吗?
可以,麻烦你帮我一下,现在真的没有办法了,
日后我必定报答
留下你电话或者QQ加你详聊
为您推荐:
其他类似问题
借条的相关知识
换一换
回答问题,赢新手礼包
个人、企业类
违法有害信息,请在下方选择后提交
色情、暴力
我们会通过消息、邮箱等方式尽快将举报结果通知您。

我要回帖

更多关于 哪位大神有最新网站 的文章

 

随机推荐